Planning a blasting cleanup in West Virginia? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what to confirm with DEP before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In West Virginia, the solid waste rule excludes certain recycled materials from the definition of solid waste. Check any reuse with DEP.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
West Virginia’s solid waste rules
West Virginia’s Solid Waste Management Rule is 33CSR1. Its definition of solid waste does not include materials recycled in one of these ways (33CSR1 §2.119.g):
- used or reused in an industrial process to make a product;
- used as an effective substitute for a commercial product; or
- returned to the original process as a substitute for raw material feedstock.
Recycling facilities must notify DEP and hold a permit, unless they only accept at no charge, buy, or transfer source-separated recyclables (33CSR1 §3.16.d). A permitted recycling facility may not receive or store hazardous waste. It may not store material for more than 60 days without DEP’s written approval.
The rule also lists coal combustion by-product uses that need no permit, such as use as blasting grit (33CSR1 §5.5.b.4). Spent media is more than the by-product; it carries coating and substrate debris. Confirm its status with DEP before relying on that list.
West Virginia’s separate beneficial use rule, 33CSR8, covers sludge and other materials with properties similar to sewage sludge. Their beneficial characteristics must include nutrient content.
Working with DEP
- Who to contact: DEP’s Division of Water and Waste Management runs the solid waste and hazardous waste programs.
- Recycling facilities: a facility that recycles spent media must notify DEP on its forms and meet the permit conditions in 33CSR1 §3.16.d, unless the source-separated exemption applies.
- Landfill disposal: a landfill may accept a waste that needs special handling only under its permit, a minor permit modification, or DEP’s written approval. DEP’s Solid Waste Program reviews analytical data for these special waste requests.
- Hazardous waste: any person who begins hazardous waste activity in West Virginia must notify DEP.
DEP Division of Water and Waste Management: (304) 926-0495.
Hazardous waste determination
West Virginia adopts the federal hazardous waste rules (40 CFR Parts 260–268, 270, 273, and 279) by reference in 33CSR20, Hazardous Waste Management System.
West Virginia narrows two federal options for very small quantity generators. It does not adopt 40 CFR 262.14(a)(5)(iv) and (v), so a very small quantity generator cannot send hazardous waste to a municipal or other nonhazardous solid waste facility (33CSR20 §5.3). Very small quantity generators must also notify DEP in writing of their hazardous waste activities (33CSR20 §4.2.1).
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEP, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
To accept a special waste, a landfill must describe to DEP the generating process, the waste, and its composition, usually with chemical analyses or safety data sheets (33CSR1 §4.13.a.3.B).
Finding a reuse destination
West Virginia decides reuse questions through its solid waste rules and facility permits. Check any destination and proposed use with DEP before scheduling delivery.
When you talk to DEP, describe the proposal using the recycling categories in 33CSR1 §2.119.g. For example, is the material an ingredient in an industrial process, or a substitute for a commercial product? If a facility will process the material, confirm it holds the needed recycling facility permit. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. A permitted recycling facility may not store material for more than 60 days without DEP’s written approval.
Keep job records, data sheets, lab reports, the waste determination, DEP approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm with DEP how its rules apply to that material, use, and receiving facility.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEP requirements, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Which West Virginia rule covers reuse?
33CSR1 excludes materials recycled as an industrial ingredient, as a substitute for a commercial product, or back into the original process. It also sets permits for recycling facilities. 33CSR8 covers sludge-like materials used for their nutrient value. Ask DEP how these apply to your material.
How long can a recycling facility store spent media?
No more than 60 days without DEP’s written approval. A permitted recycling facility may not receive or store hazardous waste.
Can a very small quantity generator landfill hazardous spent media?
Not at a municipal or other nonhazardous solid waste facility. West Virginia does not adopt the federal option that allows it.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes.
Rules and guidance
- West Virginia DEP: Solid Waste Program
- 33CSR1: Solid Waste Management Rule
- 33CSR8: Standards for Beneficial Use of Materials Similar to Sewage Sludge
- 33CSR20: Hazardous Waste Management System
- West Virginia DEP: RCRA Hazardous Waste
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction