Planning a blasting cleanup in Washington? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what Ecology needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Washington, Ecology approves it through a beneficial use determination (BUD), a statewide exemption from solid waste permitting.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Washington’s beneficial use rule
Washington’s beneficial use rule is WAC 173-350-200. A BUD exempts an approved use of a solid waste from solid waste permitting anywhere in the state. Ecology grants a BUD only for uses it finds do not threaten human health or the environment.
Before issuing a BUD, Ecology checks that the material is a nonhazardous solid waste. It also assesses whether the use presents little or no risk and meets the rule’s terms.
Every approved use must meet general conditions, including these:
- Make sure the material is not a dangerous waste under chapter 173-303 WAC.
- Do not dilute the waste to lower its contaminant levels in place of treatment or disposal.
- Keep material for beneficial use separate from waste headed for disposal or other destinations.
- Store it under chapter 173-350 WAC unless Ecology approves other storage during review.
- Report any accidental release to Ecology and the local health department immediately.
- Allow Ecology and the local health department to inspect where the material is stored or used.
- Submit an annual report to Ecology by April 1.
The rule limits fill uses. A proposal to use solid waste as part of fill must show the material meets specific engineering needs other than occupying space. A professional engineer registered in Washington must certify it.
Applying to Ecology
- Who files: the applicant files with Ecology. The application names the waste generator, the applicant, and any third-party handler. A BUD is granted only to the original applicant.
- How: submit Ecology’s General Application for Beneficial Use Exemption (ECY 040-147) with a State Environmental Policy Act (SEPA) checklist. Include evidence that the material will perform as claimed.
- Contents: describe the waste and its source materials, the proposed use, transport, sources of contaminants, and the generator’s operations. Explain how you will meet the general conditions.
- Review: Ecology notifies you when the application is complete. It then posts the application for a 45-day comment period and has 45 more days to approve or deny it.
- Changes: changing the application or adding information during public review withdraws the completeness determination. Review then restarts.
- After approval: the BUD lasts as long as the material and use stay consistent with the proposal. Ecology may add requirements. It may require a solid waste permit if conditions are not met or new information shows a threat.
Ecology’s BUD coordinator: (360) 522-6852.
Dangerous waste determination
Washington regulates hazardous waste under its own Dangerous Waste Regulations, chapter 173-303 WAC. The rule implements the federal RCRA hazardous waste program in part and uses the term “dangerous waste.”
Washington adds state-only criteria for toxicity, persistence, and other properties in WAC 173-303-100. A waste can pass the federal tests and still be a dangerous waste. Ecology lists sand blast grit containing copper, nickel, or zinc among the most common special wastes. Special waste is a low-hazard, solid, state-only dangerous waste. Under WAC 173-303-073, it can be managed outside most dangerous waste rules. It must meet that rule’s standards and be disposed of in a qualifying landfill, legitimately recycled, or treated on site. Waste the EPA regulates as hazardous, such as grit that fails TCLP for lead, cannot be special waste.
Under WAC 173-303-070, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Washington requires generators to keep determination records for at least 5 years.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, Ecology, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
For state-only toxicity, use book designation from published toxicity data or a fish bioassay. When the two disagree, the bioassay result controls (WAC 173-303-100). Ecology may require testing when it has reason to believe a waste may designate.
Finding a reuse destination
Ecology approves beneficial use case by case through the BUD process. Check any destination and proposed use with Ecology before scheduling delivery.
A BUD requires a material that is not a dangerous waste. If spent grit designates as special waste, ask Ecology which route applies before planning reuse. Ecology’s BUD registry lists pending, approved, and terminated BUDs. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste designation.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Washington L&I Division of Occupational Safety and Health (DOSH) runs Washington’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Store material awaiting beneficial use under chapter 173-350 WAC unless the BUD approves other storage.
If you manage spent grit as special waste, follow WAC 173-303-073. Store it to prevent releases. Do not hold it on site more than 180 days after the amount exceeds 2,200 pounds, and record when accumulation began. Ship it with a document such as a bill of lading. Keep records of the receiving facility’s receipt for at least five years.
Keep job records, data sheets, lab reports, the designation, Ecology approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep designation records for at least five years after the waste last leaves for treatment, storage, or disposal.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Designate the waste, including Washington’s state-only criteria, and complete the required tests.
- Choose a destination and get its material specifications.
- Apply for or confirm the Ecology BUD for that material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, Ecology approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can I use another project’s BUD?
No. Ecology grants a BUD only to the original applicant. Anyone else who wants to use a waste under an existing BUD’s terms must file their own application.
Is spent grit a dangerous waste in Washington?
It depends on the designation. Washington’s state-only criteria can make grit a dangerous waste even when it passes the federal tests. Ecology lists sand blast grit containing copper, nickel, or zinc among the most common special wastes.
How long can special waste be stored?
No more than 180 days from the date the amount on site exceeds 2,200 pounds.
Does a BUD replace other permits?
No. Approved beneficial uses must still meet all other local, state, and federal rules.
Rules and guidance
- Ecology: Beneficial use determinations
- WAC 173-350-200: Beneficial use permit exemptions
- Ecology: General Application for Beneficial Use Exemption (ECY 040-147)
- Ecology: Beneficial use determinations registry
- Chapter 173-303 WAC: Dangerous Waste Regulations
- WAC 173-303-070: Designation of dangerous waste
- WAC 173-303-073: Conditional exclusion of special wastes
- WAC 173-303-100: Dangerous waste criteria
- Ecology: Focus on Special Waste Exclusion (21-04-013)
- Ecology: Washington state-only criteria
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction
- Washington L&I Division of Occupational Safety and Health (DOSH)