Planning a blasting cleanup in Virginia? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. Virginia calls DEQ’s case-specific approval a “beneficial use determination.”
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Virginia’s beneficial use rule
Virginia’s beneficial use rule is 9VAC20-81-97. On request, DEQ may make a case-specific determination that a solid waste can be beneficially used:
- in a manufacturing process to make a product; or
- as an effective substitute for a commercial product.
The proposal must be a reuse rather than disposal. A material going into a manufacturing process must not need decontamination or special handling first. DEQ may also apply other criteria it considers appropriate.
DEQ may approve the request, deny it, or approve it with conditions. It also sets the point where the material stops being a solid waste. Unless DEQ decides otherwise, that point is when the material is used to make a product or as a substitute product.
Determinations involving coal combustion residuals must also meet the federal definition of beneficial use of CCR in 40 CFR 257.53.
Some reused materials are not solid wastes at all under 9VAC20-81-95. Examples are materials used as an ingredient in an industrial process, or as an effective substitute for commercial products or natural resources. They must not be reclaimed or accumulated speculatively. Material is not accumulated speculatively when it has a feasible use and 75% of it is removed from the facility each year (9VAC20-81-10).
Requesting a DEQ determination
- Who files: the generator or the proposed user of the material.
- What to send: a description of the waste and its proposed use, the chemical and physical characteristics of the waste and each proposed product, and evidence of a known or reasonably probable market.
- Market evidence: describe how the product will be used, show it meets any industry standards for that product, or provide other proof that a market exists.
- Control plan: include a solid waste control plan. It must cover the waste source, periodic testing, disposal of any manufacturing residue, storage type and maximum inventory, run-on and run-off control, and practices that keep the material from dispersing.
- Review: DEQ decides in writing within 90 days after it receives complete information. It may waive some information depending on the use.
- After approval: DEQ may revoke a determination if the information it relied on was wrong or is no longer valid, a condition is violated, or the use becomes a public nuisance.
Hazardous waste determination
Virginia adopts the federal hazardous waste rules (40 CFR Parts 124, 260–266, 268, 270, 273, and 279) by reference in Part III of the Virginia Hazardous Waste Management Regulations, 9VAC20-60.
Virginia adds some generator rules in 9VAC20-60-262. Large quantity generators must notify DEQ when they set up each 90-day accumulation area, and pay an annual fee. A very small quantity generator may send hazardous waste to a solid waste facility only in full compliance with the Solid Waste Management Regulations, 9VAC20-81.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEQ, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
A beneficial use request must report the chemical and physical characteristics of the waste and each proposed product. Its control plan must include periodic testing to confirm the product’s composition has not changed significantly.
Finding a reuse destination
DEQ decides beneficial use case by case. Check any destination and proposed use with DEQ before scheduling delivery.
When you talk to DEQ, describe the proposal using the two uses in 9VAC20-81-97. Is the material used in a manufacturing process to make a product, or as a substitute for a commercial product? Show the market for the product and any industry standards it meets. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Virginia Occupational Safety and Health (VOSH) runs Virginia’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. A beneficial use control plan must name the storage type and hold no more than 90 days of inventory before use. It must also control run-on and run-off at storage areas.
Keep job records, data sheets, lab reports, the waste determination, DEQ determinations, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Request or confirm the DEQ beneficial use determination for that material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEQ approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Who can request a determination?
The generator or the proposed user of the material. ARS can help gather the material information.
Can I use another project’s determination?
Check with DEQ first. Each determination is case-specific and rests on the information submitted for that waste and use. DEQ may revoke a determination when that information is no longer valid.
How long can spent media be stored before use?
A beneficial use control plan limits the maximum inventory to 90 days before use.
When do we need to test again?
Repeat the determination when the waste may have changed. Follow the periodic testing in your control plan and any DEQ conditions. Ask about retesting when the abrasive, coating, substrate, or process changes.
Rules and guidance
- 9VAC20-81-97: Beneficial use demonstrations
- 9VAC20-81-95: Identification of solid waste
- 9VAC20-81-10: Definitions
- 9VAC20-60: Virginia Hazardous Waste Management Regulations
- 9VAC20-60-262: Adoption of 40 CFR Part 262 by reference
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction
- Virginia Occupational Safety and Health (VOSH)