Planning a blasting cleanup in Utah? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what Utah DEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. Utah regulates recycling and use of solid waste on the land under Rule R315-312. The Division of Waste Management and Radiation Control (DWMRC) runs the program.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Utah’s recycling and land use rules
Utah requires Director approval to own, build, change, or run a facility or site that transfers, treats, or disposes of nonhazardous solid waste (Utah Code § 19-6-108). DWMRC gives approval as a permit or a letter of approval, unless the rules exempt the activity.
Rule R315-312 sets standards for any facility that recycles or uses solid waste on the land. That includes piling waste for recycling or use. It does not apply to recycling done only in containers, tanks, vessels, or enclosed buildings. It does not apply to hazardous waste.
Under R315-312-2, a recycling facility must:
- meet the general facility requirements of R315-302-2;
- submit a general plan of operation, and any other information the Director requests, before recycling begins;
- certify by March 1 each year that it operated under that plan during the past year; and
- provide financial assurance for cleanup and closure if the Director requires it.
Outdoor piles have a limit. Storage counts as disposal if at least half the material on hand at the start of a year is not shown recycled by year end. That applies when any material has also been on site more than two years, unless the Director approves a longer period. Storage also counts as disposal if water, air, or land contamination has occurred or is likely. The Director may then require a disposal facility permit.
Utah defines recycling as extracting valuable materials from the waste stream and turning them into usable materials with a demonstrated or potential market (R315-301-2). Recycling does not include making so much material that no market exists for it.
Applying to DWMRC
- Who files: the person who owns or operates the receiving facility or site.
- How: use the application checklist for the facility type. Submit it through DEQ’s Community Portal. New applicants register an account and create the facility first.
- Review: DWMRC checks the application for completeness, then does a full technical review. It sends a draft permit for your review.
- Public notice: when the action requires it, the draft permit has a 45-day public comment period. The Division Director makes the final decision.
- Before you apply: Solid Waste Program staff can do pre-application reviews. You can also ask for a pre-application meeting.
- After approval: recycling facilities certify by March 1 each year that they followed their plan of operation.
DWMRC: (801) 536-0200. Ask for the Solid Waste Section.
Hazardous waste determination
Utah writes the federal hazardous waste rules into its own code, Rules R315-124 and R315-260 through R315-273. They are numbered to match 40 CFR.
Utah’s solid waste rules also reach very small quantity generator hazardous waste. R315-301-2 lists it as a special waste. When an industrial facility generates it, it is also industrial solid waste.
Under Utah Admin. Code R315-262-11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DWMRC, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
The Director may ask a recycling facility for more information before it starts operating (R315-312-2(1)).
Finding a reuse destination
DWMRC reviews each facility’s approval. Check any destination and proposed use with DWMRC before scheduling delivery.
Review the receiving facility’s approval and the waste types it accepts. DEQ’s Utah Recycling & Waste Facility Map and facility lists show permitted sites. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Utah Occupational Safety and Health Division runs Utah’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Plan outdoor piles so at least half the material on hand each year is recycled by year end. Do not keep material on site more than two years without Director approval.
Keep job records, data sheets, lab reports, the waste determination, DWMRC approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm the destination has a DWMRC approval or plan of operation that covers the material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DWMRC’s requirements, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Does a recycler of spent media need approval?
A facility that recycles or uses solid waste on the land must meet R315-312. It must submit a plan of operation before it starts. Recycling done only in containers, tanks, vessels, or enclosed buildings falls outside R315-312.
How long can spent media sit in outdoor piles?
Storage counts as disposal if at least half the material on hand at the start of a year is not recycled by year end. That applies once any material is more than two years old. The Director may approve a longer period.
Is there a yearly filing?
Yes. Each recycling facility under R315-312 certifies by March 1 that it ran under its plan of operation during the past year.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any conditions in the facility’s approval.
Rules and guidance
- Utah DEQ: Solid Waste Facility Permits
- Utah DEQ: Solid Waste Program
- Utah Code § 19-6-108: Plan approval required
- R315-312-1: Recycling and composting facility applicability
- R315-312-2: Recycling and composting requirements
- R315-301-2: Solid waste definitions
- R315-262-11: Hazardous waste determination
- DWMRC: Contacts
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction
- Utah Occupational Safety and Health Division