Planning a blasting cleanup in Texas? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what TCEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. Texas treats it as recycling under 30 TAC Chapter 335. Some recycled materials are not solid waste at all.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Texas’s industrial waste recycling rules
Solid waste from an industrial, manufacturing, mining, or agricultural process is industrial solid waste (30 TAC § 335.1). TCEQ lists blast media among wastes that may be special wastes in some cases. It also lists abrasive-blast material among special wastes that vary and may need testing.
Under the § 335.1 definition of solid waste, a material is not solid waste when it is shown to be recycled by being:
- used as an ingredient in an industrial process to make a product, without first being reclaimed;
- used as an effective substitute for a commercial product; or
- returned to the original process that generated it, as a substitute for feedstock, without first being reclaimed or land disposed.
These exclusions do not apply to material used in a manner constituting disposal or used to make products applied to the land. They also do not apply to material burned for energy or accumulated speculatively.
Land uses have their own test. Nonhazardous material applied to the land, or used in products applied to the land, is not solid waste only if it meets every criterion in § 335.1. These include a legitimate market, meeting product specifications without treatment, and Class 3 status. Certain metals may instead be Class 2 within set limits. At least 75 percent of each year’s production must be recycled or transferred for recycling.
Recycling nonhazardous industrial waste needs no waste permit when done under § 335.24(h). It still needs advance notice to TCEQ. The executive director may also apply the shipping and reporting rules in §§ 335.10–335.15 when needed to protect health and the environment.
Notifying TCEQ
- Who files: the generator files Form TCEQ-0525. The receiving recycler files Form TCEQ-0524.
- When: at least 90 days before recycling begins (30 TAC § 335.6(a)).
- How: email the form to ihwper@tceq.texas.gov or submit it through STEERS.
- Changes: notify TCEQ again after substantial changes in the waste’s composition, the recycling method, or the end products.
- Nonwastes: no notice is needed for material that is not solid waste. It is still subject to the general prohibitions of 30 TAC § 335.4.
- Proof: anyone claiming a material is not solid waste must show a known market and meet the exclusion’s terms. Keep documents such as contracts showing the material is used in production.
- Disposal instead: when a special waste needs prior authorization for municipal landfill disposal, request it on Form TCEQ-00152.
TCEQ Industrial and Hazardous Waste Permits Section: 512-239-2335, ihwper@tceq.texas.gov.
Hazardous waste determination
Texas adopts the federal hazardous waste rules into 30 TAC Chapter 335, with or without changes.
Texas adds its own classes for nonhazardous industrial waste. Under § 335.503, the generator classifies each nonhazardous industrial waste as Class 1, 2, or 3. A waste is Class 1 if its TCLP extract meets or exceeds a level in the Texas Class 1 table (§ 335.505). A site that generates more than 100 kilograms of Class 1 waste in a month must register with TCEQ (§ 335.6(c)).
Under 30 TAC § 335.504, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Texas requires generators to keep determination records for at least 3 years.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, TCEQ, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
The Texas Class 1 limits are lower for some metals: lead 1.5 mg/L, arsenic 1.8 mg/L, cadmium 0.5 mg/L, and beryllium 0.08 mg/L (TCEQ RG-022, Appendix B).
Finding a reuse destination
Texas relies on advance notice, not a reuse permit. The generator and the recycler must each determine whether the material is a waste. Check any destination and proposed use with TCEQ before scheduling delivery.
Describe the use with the categories in § 335.1. Is the material a manufacturing ingredient, a substitute for a commercial product, or a land use? Get the receiver’s specifications, written acceptance, and evidence of a legitimate market. If reuse is not cleared, arrange disposal that fits the waste class. Class 1 waste sent to a Type I municipal landfill goes to a dedicated Class 1 trench with a manifest.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Material is accumulated speculatively unless it can feasibly be recycled. At least 75 percent must also be recycled or transferred during the calendar year (§ 335.17(a)(8)). Label each storage unit with the date accumulation began.
Keep job records, data sheets, lab reports, the waste determination and class, TCEQ notices, and the receiving site’s acceptance together. Record what ships and where it goes. Texas requires generators to keep waste documentation for at least three years after the waste is no longer generated or stored, or until site closure (§ 335.513(c)).
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination, assign the Texas waste class, and complete the required tests.
- Choose a destination and get its material specifications.
- File Form TCEQ-0525 at least 90 days before recycling begins, and confirm the receiver filed Form TCEQ-0524.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, the Texas waste class, TCEQ notice, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Who notifies TCEQ?
Both sides. The generator files Form TCEQ-0525 and the receiving recycler files Form TCEQ-0524, each at least 90 days before recycling begins.
Does recycling need a permit?
Legitimate recycling of nonhazardous industrial waste under § 335.24(h) needs no waste permit. It still needs the 90-day notice.
How long can spent media be stockpiled?
Recycle or transfer at least 75 percent of the accumulated material each calendar year. Otherwise it is accumulated speculatively and stays a solid waste.
When do we need to notify or test again?
Notify TCEQ again after substantial changes in waste composition, recycling method, or end products. Recheck the waste class when the abrasive, coating, substrate, or process changes.
Rules and guidance
- TCEQ RG-240: Can I Recycle Some of My Industrial or Hazardous Wastes?
- TCEQ RG-022: Guidelines for the Classification and Coding of Industrial and Hazardous Wastes
- TCEQ: Special Waste Disposal
- TCEQ: Industrial and Hazardous Waste Permits
- 30 TAC § 335.1: Definitions
- 30 TAC § 335.6: Notification requirements
- 30 TAC § 335.17: Special definitions for recyclable materials
- 30 TAC § 335.24: Requirements for recyclable materials
- 30 TAC § 335.503: Waste classification and waste coding
- 30 TAC § 335.504: Hazardous waste determination
- 30 TAC § 335.513: Documentation required
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction