Planning a blasting cleanup in Tennessee? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what TDEC needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. Tennessee calls this beneficial use. The generator must show TDEC that the proposed use is safe.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Tennessee’s beneficial use rule
Tennessee’s beneficial use rule is Rule 0400-11-01-.02(1)(b)3(xxi). It exempts from solid waste permits the beneficial use of waste that does not constitute disposal. The generator must show, to the Commissioner’s satisfaction, that the use is not detrimental to public health, safety, or the environment.
Land placement falls under the same test. Under Rule 0400-11-01-.13, land application of solid waste not covered elsewhere is subject to the beneficial use rule.
Two related routes can apply:
- Recovered materials: materials diverted or removed from the solid waste stream for sale, use, reuse, or recycling are not solid waste (Rule 0400-11-01-.01(2)). TDEC guidance says the market or use must be viable and documented. Recovered material that is not actually reused becomes solid waste again.
- Recovered materials processing facilities: a facility that only stores, processes, and resells or reuses recovered materials needs no permit if it notifies TDEC first (Rule 0400-11-01-.02(1)(b)3(xxii)). A facility that also processes solid waste from off site needs a processing permit-by-rule.
Storage has a limit. Recyclable material may not be stored for more than one year without written approval from the Division (Rule 0400-11-01-.02(1)(b)3(xv)). On request, the operator must show a viable market for all stored waste.
Working with TDEC
- Who shows the use is safe: the generator makes the beneficial use demonstration to TDEC.
- Scope: describe the specific material, its waste determination, and the proposed use. Show that the use is not disposal.
- Receiving processors: a recovered materials processing facility files Form CN-1605 before it starts. The notice lists the materials it will receive, its maximum storage capacity for each, and its process. TDEC normally processes it in about 60 days. There is no fee.
- Changes: a recovered materials processing facility must notify TDEC before changing ownership, location, materials received, storage capacity, or processing method. It files an annual report by March 1.
- Manufacturers: a facility that takes recovered materials as a declared commodity for its own manufacturing process does not file the notice.
- Disposal instead: a permitted landfill or processing facility may not accept a special waste, such as industrial waste, without written TDEC approval (Rule 0400-11-01-.01(4)). The generator files Form CN-1051 for each facility. The fee is $300.
- Liquids and sludge: keep wet-blasting sludge separate. Liquid wastes are restricted from solid waste landfills. Ask TDEC how to manage them.
TDEC Waste Management Branch: 615-532-0780, Solid.Waste@tn.gov.
Hazardous waste determination
Tennessee’s hazardous waste rules are Chapter 0400-12-01. They carry the federal rules into state rule, with each section keyed to its 40 CFR counterpart.
Tennessee asks more of small quantity generators. Under Rule 0400-12-01-.03(5)(b), small and large quantity generators that ship hazardous waste off site file an annual report by March 1. The report includes efforts to reduce waste volume and toxicity. A new generator of more than 100 kilograms (220 pounds) in a month must notify TDEC within 90 days.
Under Rule 0400-12-01-.03(1)(b), the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, TDEC, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
TDEC guidance warns generators not to rely too heavily on suppliers’ Safety Data Sheets to identify hazardous constituents.
Finding a reuse destination
TDEC decides beneficial use case by case. Check any destination and proposed use with TDEC before scheduling delivery.
When you talk to TDEC, explain how the use is productive and why it is not disposal. If the receiver is a recovered materials processing facility, confirm it has notified TDEC for your material. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination. A TDEC special waste approval does not require a landfill to take the waste, so get the operator’s acceptance too.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
TOSHA runs Tennessee’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Recovered material that is mixed back into other solid waste is no longer a recovered material. Do not store recyclable material more than one year without TDEC’s written approval.
Keep job records, data sheets, lab reports, the waste determination, TDEC approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years. TDEC encourages generators to keep determination records for nonhazardous waste streams too.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Make the beneficial use demonstration to TDEC, or confirm the receiver’s recovered materials notice covers your material.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, TDEC’s review, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Who has to show the use is safe?
The generator. Rule 0400-11-01-.02(1)(b)3(xxi) puts the demonstration on the generator. ARS can help gather the material information.
How long can spent media be stored for recycling?
No more than one year without written approval from the Division. TDEC can also ask you to show a viable market for the stored material.
Does the recycler need a permit?
A facility that handles only recovered materials notifies TDEC instead of getting a permit. A facility that also processes solid waste from off site needs a processing permit-by-rule.
When do we need to test again?
Repeat the determination when the waste may have changed. For landfill disposal, special waste approvals are recertified every three years, and a changed waste stream needs a new application.
Rules and guidance
- TDEC: Waste Management Branch
- Rule 0400-11-01-.02: Permitting of solid waste facilities, including beneficial use
- Rule 0400-11-01-.01: Definitions and special waste approval
- Rule 0400-11-01-.13: Land application facilities
- TDEC: Clarification of the Definition of Recovered Materials
- TDEC: Notification for Recovered Materials Processing Facilities
- TDEC: Special Waste Approval
- TDEC: Special Waste Guidance
- Rule 0400-12-01-.03: Hazardous waste generator standards
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic