Planning a blasting cleanup in South Dakota? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DANR needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. South Dakota law ranks recycling and reuse above landfill disposal. Its solid waste rules apply through DANR permits.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
South Dakota’s solid waste permit rules
South Dakota’s solid waste law is SDCL chapter 34A-6. SDCL 34A-6-1.2 sets the state’s order of preference. Volume reduction at the source comes first, then recycling and reuse, then energy production, then disposal.
The rules are ARSD article 74:27. Under ARSD 74:27:08:01, no one may build or operate a solid waste facility without a valid permit. A solid waste facility is one used for the storage or disposal of solid waste (SDCL 34A-6-1.3).
General permits cover groups of similar facilities. ARSD 74:27:10:02 lists the categories, including rubble disposal, construction and demolition debris, and sludge disposal. It also allows other categories that meet the general permit criteria. DANR must authorize each facility before it accepts any waste under a general permit.
ARSD 74:27 does not set up a separate beneficial use approval. Ask DANR’s Solid Waste Section how the rules apply to the material, the receiving site, and the proposed use.
Applying to DANR
- Who files: the person who will build or operate the receiving facility applies for the permit.
- How: use DANR’s application form for the facility type. Most forms work for an individual permit or for authorization under a general permit.
- Fees: ARSD 74:27:08:03 sets fees by facility size. Type I is $5,000, Types IIA and IIB are $500, Type III is $250, and Type IV has no fee.
- Size: facility type depends on tons received each year. A Type IV facility receives less than 500 tons a year.
- Review: DANR reviews the application and recommends a decision. It publishes the recommendation for a 30-day public comment period. If no one contests it, the recommendation becomes final.
- Before you apply: applicants may schedule a meeting with DANR to discuss application requirements (ARSD 74:27:08:05).
- Restricted use sites: the restricted use site general permit lists authorized wastes. DANR may approve other wastes case by case. This is a disposal route, not reuse.
DANR Solid Waste Section: (605) 773-3153.
Hazardous waste determination
South Dakota adopts the federal hazardous waste rules by reference in ARSD 74:28:21:01.01. It covers 40 CFR Parts 124, 144, 260–268, 270, 273, and 279 as in effect on July 1, 2022.
The generator standards are in ARSD 74:28:23:01, which applies 40 CFR Part 262. DANR’s Hazardous Waste Section assigns generator identification numbers. Small quantity generators re-notify DANR every four years on EPA Form 8700-12.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DANR, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
Ask DANR what analyses it needs for the receiving facility’s permit before you sample.
Finding a reuse destination
DANR reviews each receiving facility through its permit. Check any destination and proposed use with DANR before scheduling delivery.
Confirm the receiving facility holds a permit or general permit authorization that covers your material. A copy of a general permit does not prove a facility is authorized. DANR issues each authorized operator a certificate and letter of authorization. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. A site used to store solid waste is a solid waste facility, so plan pickup to avoid long storage.
Keep job records, data sheets, lab reports, the waste determination, DANR permits or authorizations, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm the destination’s DANR permit or general permit authorization covers the material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DANR’s permit requirements, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Does a general permit for another material cover spent media?
Not automatically. Each general permit covers a specific category of waste handling. DANR must authorize each facility before it accepts waste.
What does a permit application cost?
Fees run from no fee for a Type IV facility to $5,000 for a Type I facility (ARSD 74:27:08:03).
How does DANR decide on a permit?
DANR reviews the application and publishes its recommendation for 30 days of public comment. An uncontested recommendation becomes final.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any conditions in the receiving facility’s permit.
Rules and guidance
- DANR: Solid Waste
- DANR: Solid Waste Permits and Application Forms
- DANR: Restricted Use Site General Permit
- SDCL 34A-6-1.2: Solid waste management policy
- SDCL 34A-6-1.3: Definitions
- ARSD 74:27:08:01: Permits required
- ARSD 74:27:08:03: Fees
- ARSD 74:27:10:02: General permit categories
- DANR: Hazardous Waste
- ARSD 74:28:21:01.01: Incorporation by reference
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction