Planning a blasting cleanup in South Carolina? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DES needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. South Carolina law handles reuse through its definition of “recovered materials.” Recovered materials are not solid waste.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
South Carolina’s recovered materials rule
South Carolina’s Solid Waste Policy and Management Act sets the framework. Under S.C. Code § 44-96-40, solid waste does not include recovered materials. A recovered material must meet all of these conditions:
- it has known use, reuse, or recycling potential;
- it can be feasibly used, reused, or recycled;
- it has been diverted or removed from the solid waste stream for sale, use, reuse, or recycling; and
- at least 75 percent by weight of the material received in the previous calendar year was used, reused, recycled, or transferred to another site for those purposes.
A recovered materials processing facility handles only recovered materials. It must keep records of the weight it receives and the weight it uses, recycles, or transfers. It must also record where the material finally went, and show DES these records on request. Solid waste it generates stays regulated.
Material that does not qualify is solid waste. A solid waste management facility needs a DES permit under S.C. Code § 44-96-290. That includes facilities that store, process, recycle, or dispose of solid waste.
Structural fill has its own limits. R.61-107.19 limits structural fill to land-clearing debris, hardened concrete, cured asphalt, bricks, blocks, and other materials DES names by regulation. Materials contaminated by hazardous constituents or petroleum, or painted with lead-based paint, may not be used.
Working with DES
- Before shipping: confirm with the receiving facility that it meets the recovered materials conditions. The receiving facility keeps the weight and destination records.
- What to show: the known use, how the material is kept separate from other waste, and the receiver’s 75 percent turnover.
- Processing: a facility that processes solid waste needs a permit under R.61-107.6. That regulation does not apply to recovered materials processing facilities. It also exempts facilities processing waste generated on property under the same ownership or control.
- Landfill disposal: the landfill class depends on a waste characterization report submitted to DES (R.61-107.19, Part I, Section C).
- Special waste: industrial process waste, including waste from performing a service, is a special waste. A municipal solid waste landfill must give prior written approval, under DES requirements, before accepting it (S.C. Code § 44-96-390).
Use DES’s permitting contacts to reach the solid waste processing and landfill programs. DES main line: (803) 898-3432, info@des.sc.gov.
Hazardous waste determination
South Carolina’s hazardous waste rules are Regulation 61-79. Its parts follow the federal numbering, from R.61-79.124 and R.61-79.260 through R.61-79.273. Used oil is covered separately in R.61-107.279.
South Carolina reporting differs from the federal rules. Under R.61-79.262.41, a large quantity generator that ships hazardous waste off site files a quarterly report. The report is due within 30 days after each quarter ends. Small quantity generators file an annual notification by January 30. Both pay an annual fee.
Under R.61-79.262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DES, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
For landfill disposal, R.61-107.19 compares TCLP results with South Carolina drinking water limits (MCLs) to decide which landfill class may take the waste.
Finding a reuse destination
Reuse turns on the recovered materials conditions. Check any destination and proposed use with DES before scheduling delivery.
Confirm the receiver meets the recovered materials conditions, including the 75 percent turnover. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination. Class Two landfills may accept a characterized waste below 10 times the MCL only with DES approval.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
SC OSHA runs South Carolina’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Plan volumes so the receiver can use, recycle, or transfer at least 75 percent of what it receives each year.
Keep job records, data sheets, lab reports, the waste determination, DES correspondence, and the receiving site’s acceptance together. Record what ships, its weight, and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm with DES that the material and receiver meet the recovered materials conditions, or get the needed permit or landfill approval.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, the recovered materials conditions, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can spent media go in a structural fill?
Only if DES names it by regulation. R.61-107.19 limits structural fill to listed materials, such as hardened concrete, bricks, and land-clearing debris. Material painted with lead-based paint or contaminated by hazardous constituents is excluded.
How much must be recycled to count as a recovered material?
At least 75 percent by weight of the material received in the previous calendar year. It must be used, reused, recycled, or transferred to another site for those purposes.
Does the recycler need a permit?
A recovered materials processing facility is not a solid waste management facility, so it needs no solid waste permit. A facility that processes solid waste needs a permit under R.61-107.6.
When do we need to test again?
Repeat the determination when the waste may have changed. For landfill disposal, R.61-107.19 requires recharacterization at least every three years by process knowledge and every six years by TCLP. It also requires it when the process or raw materials change significantly.
Rules and guidance
- S.C. Code Title 44, Chapter 96: Solid Waste Policy and Management Act
- DES: Solid Waste
- DES: Consolidated Solid Waste Landfill Regulation
- R.61-107.19: Solid Waste Landfills and Structural Fill
- R.61-107.6: Solid Waste Processing Facilities
- DES: Laws and Regulations – Hazardous Waste
- R.61-79.262: Standards Applicable to Generators of Hazardous Waste
- DES: Overview of Hazardous Waste Generator Requirements
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction
- SC OSHA