Planning a blasting cleanup in Rhode Island? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DEM needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Rhode Island, DEM decides case by case through a “beneficial use determination” (BUD).
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Rhode Island’s beneficial reuse law
Rhode Island’s beneficial reuse law is R.I. Gen. Laws § 23-18.9-16. DEM may approve environmentally beneficial reuse of solid waste in a municipality. It may weigh the waste’s physical and chemical characteristics, the proposed use, and the location.
A BUD is the case-by-case review of a specific solid waste, for a specific purpose, at a specific location in the host municipality (§ 23-18.9-7). Beneficial reuse material must be a processed, nonhazardous solid waste that is not already defined as recyclable material.
No one may process, store, transport, dispose of, or otherwise use solid waste for beneficial reuse without a written BUD from DEM. Every approved proposal must include:
- public notice in a newspaper of general circulation;
- notice to the manager or mayor and council of the municipality; and
- a hearing held in the affected municipality.
DEM’s BUD guidelines (Policy WM-SW-2007-01) treat a BUD request as part of an application for a variance from the solid waste regulations. Uses that apply material to land are presumed low-utility. DEM looks closely at whether they are reuse or simply another way of disposal.
Applying to DEM
- Who files: usually the facility that will accept the waste and turn it into a saleable product. A generator may apply if it also recycles the waste and makes it directly available for reuse.
- Before filing: DEM recommends a meeting to discuss the proposal. It strongly recommends sending a material characterization plan for comment before any sampling.
- Application: apply in writing. Answer each of the guidelines’ considerations, including hazard controls, the raw material it replaces, the end market, and why the use is not disposal.
- Controls: state the quantity received and the most stored at one time. Name the source and generator, and describe the process that makes the waste, with a diagram.
- Municipal copy: if you propose reusing more than three cubic yards in one location, send a copy of the application to that municipality.
- Notice and hearing: before DEM decides, the applicant posts newspaper notice and holds a public hearing. The applicant pays these costs.
- Review: DEM first checks the application for completeness. Its guidelines estimate about three months to one year for the review.
- Term and renewal: an approval expires one year from issue unless it says otherwise. It may be renewed for three years. Request renewal in writing at least 60 days before it expires.
- Financial assurance: DEM may require assurance that the project will be completed and unused material removed.
- After approval: DEM may deny, suspend, or revoke an approval. It may refuse or revoke a BUD where the applicant or a facility involved has existing violations.
DEM Office of Land Revitalization and Sustainable Materials Management, 235 Promenade Street, Providence, RI 02908: (401) 222-2797. Current and past BUD approvals are posted on DEM’s Beneficial Use Determination page.
Hazardous waste determination
Rhode Island’s hazardous waste rules are 250-RICR-140-10-1. They incorporate 40 CFR Parts 124, 260–261, 263–265, 266 (except Subpart H), 270, and 273 from the July 1, 2013 CFR. Rhode Island’s own generator rules in § 1.7 apply in place of 40 CFR Part 262.
Rhode Island adds state hazardous wastes. Waste with PCBs at 50 ppm or more is Rhode Island hazardous waste R007, so ask the lab about PCBs when coatings may contain them. After the federal checks, generators must check these state types. Testing must use the approved methods in 40 CFR Part 261, Subpart C. To rely on product knowledge instead, the generator must show in writing clear and convincing scientific evidence of the waste’s characteristics and the process that generated it. Conditionally exempt small quantity generators may not send hazardous waste to solid waste facilities.
Under 250-RICR-140-10-1.7.3, the generator must decide whether spent media is hazardous:
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Test the waste, or apply knowledge of the materials and processes used.
Rhode Island requires generators to keep determination records for at least 3 years.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEM, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
DEM’s guidelines ask for a characterization plan covering sample collection, analyses such as TCLP, variability, the number of samples, and health and ecological risks.
Finding a reuse destination
DEM decides reuse case by case. Check any destination and proposed use with DEM before scheduling delivery.
When you talk to DEM, explain how the material substitutes for a raw material and why the use is not disposal. For a manufactured soil product, DEM’s guidelines require a showing that it meets the residential direct exposure criteria for soils and DEM’s compost quality standards. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. The BUD application must state the most material stored at the site at any one time. It must also describe storage, handling, runoff, and erosion controls.
Keep job records, data sheets, lab reports, the waste determination, DEM approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Generators keep test results for waste determinations for at least three years under § 1.7.7.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- File or confirm the DEM BUD for that material, purpose, and location.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEM approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can I use another project’s approval?
No. A BUD covers a specific solid waste, for a specific purpose, at a specific location.
Who files the request?
Usually the facility that will accept and recycle the waste. A generator may file if it also recycles the waste and makes it directly available for reuse. ARS can help gather the material information.
Is a public hearing required?
Yes. Every approved proposal needs newspaper notice, notice to the municipality’s leaders, and a hearing in the affected municipality.
How long does an approval last?
One year from issue unless the approval says otherwise. Request renewal in writing at least 60 days before it expires.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any schedule in the DEM approval.
Rules and guidance
- R.I. Gen. Laws § 23-18.9-16: Beneficial reuse of solid waste
- R.I. Gen. Laws § 23-18.9-7: Definitions
- DEM Guidelines on Beneficial Use Determinations (Policy WM-SW-2007-01)
- DEM Beneficial Use Determination program
- 250-RICR-140-10-1: Rules and Regulations for Hazardous Waste Management
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction