Planning a blasting cleanup in Pennsylvania? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DEP needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. Pennsylvania’s rules call this “beneficial use.” DEP authorizes it for residual waste through general permits. A material may also qualify as a “coproduct.”
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Pennsylvania’s beneficial use rules
Pennsylvania regulates beneficial use of residual waste in 25 Pa. Code Chapter 287, Subchapter H. Under § 287.611, DEP may issue general permits for a category of processing or beneficial use. The wastes must come from the same or similar operations and have similar physical and chemical makeup. Use as an ingredient or product substitute may not present more harm than the material it replaces.
Fill is limited. DEP will not issue a general permit for a residual waste landfill, a valley fill, or other fill. It also will not issue one to level or grade an area unless construction follows promptly. A general permit may cover use as a construction material.
Waste used under a general permit stops being a waste if it is used as the permit allows and does not threaten health or the environment (§ 287.7).
A coproduct is not regulated as a waste. Under § 287.8, the person making a coproduct determination evaluates its constituents and exposure routes. Where it replaces a product or raw material, it may not present a greater threat of harm than that material. Coproduct determinations apply only to land uses, such as roadway aggregate, pipe bedding, or construction materials, or to certain energy recovery.
One general permit names spent abrasive. WMGR147 authorizes processing spent garnet for reuse in waterjet cutting and abrasive blasting. Processing is limited to washing, separation and sizing, and drying. It covers only spent garnet.
Stockpiles have a limit. Material accumulated speculatively is regulated as waste. To avoid that, show the material has a feasible means of recycling. At least 75 percent of the amount on hand on January 1 must be recycled or transferred for recycling that year (§ 287.1).
Applying to DEP
- Who files: the person or municipality that will operate under a general permit registers or applies for a determination of applicability, as the permit requires.
- Determination of applicability: required for construction material, antiskid, or other direct land placement. Apply to the DEP regional office on DEP forms, with a $500 nonrefundable fee.
- Review: DEP publishes notice in the Pennsylvania Bulletin. It decides within 60 days of the notice, or 120 days for construction materials with a 60-day comment period. The clock stops while DEP waits for requested corrections.
- New general permit: any person or municipality may apply on a DEP form, with a $2,000 fee. Describe the waste with chemical analyses under § 287.132, the process that makes it, proposed contaminant limits, and proof the waste works for the use.
- Land placement: for construction material, soil, or antiskid uses, evaluate health and environmental impacts and exposure pathways. Notify each municipality where you plan to operate.
- Term and renewal: a general permit lasts no more than ten years. Apply for renewal at least 180 days before it expires, with a $300 fee.
- After approval: tell DEP immediately of any change in the waste’s physical or chemical properties, including leachability. DEP may modify, suspend, or revoke coverage.
- WMGR147: get written DEP approval before starting. Receipt is capped at 25,000 tons of spent garnet per year. Processing must be in an enclosed building, and the garnet may not be mixed with other wastes.
Apply through the waste management program at the DEP regional office for your county.
Hazardous waste determination
Pennsylvania adopts the federal hazardous waste rules by reference in 25 Pa. Code Chapters 260a–270a. § 261a.1 adopts 40 CFR Part 261, and § 262a.10 adopts Part 262.
Two state rules stand out. A generator’s finding that a waste is not hazardous does not stop DEP from finding it hazardous (§ 262a.11). A very small quantity generator may not dispose of hazardous waste in a municipal or residual waste landfill in Pennsylvania (§ 262a.14).
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEP, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
A coproduct determination compares total and leachable levels of hazardous or toxic constituents with the material it replaces, using a leaching test suited to the use.
Finding a reuse destination
DEP approves beneficial use of residual waste through general permits. Check any destination and proposed use with DEP before scheduling delivery.
When you talk to DEP, ask whether an existing general permit covers your material and use. Describe the proposal in the terms of § 287.611. Is the material an ingredient in a product, or a substitute for a commercial product? Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Plan volumes to meet the 75 percent turnover test so the material is not accumulated speculatively.
Keep job records, data sheets, lab reports, the waste determination, DEP approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep coproduct documentation and give it to anyone who sells, holds, or uses the material. WMGR147 requires waste and sampling records for five years and an annual report by March 1. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm the general permit and DEP coverage, or the coproduct determination, for that material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEP approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can I use another project’s approval?
Only if your material and use fit that general permit. Each operator needs its own registration or determination of applicability, as the permit requires.
Does WMGR147 cover coal slag?
No. It covers only processing spent garnet for reuse in waterjet cutting and abrasive blasting.
Can spent media be used as fill?
Not under a general permit. DEP does not issue general permits for fill, or for grading without prompt construction.
How long can spent media be stockpiled?
At least 75 percent of the amount on hand on January 1 must be recycled or transferred for recycling that year. Otherwise it is accumulated speculatively and regulated as waste.
When do we need to test again?
Repeat the determination when the waste may have changed. Under a general permit, tell DEP immediately of any change in physical or chemical properties, including leachability.
Rules and guidance
- Pennsylvania DEP: Beneficial Use
- 25 Pa. Code Chapter 287: Residual Waste Management
- 25 Pa. Code § 287.621: Application for general permit
- 25 Pa. Code § 287.8: Coproduct determinations
- General Permit WMGR147: Spent garnet in waterjet cutting and abrasive blasting
- 25 Pa. Code Chapter 262a: Hazardous waste generators
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction