Planning a blasting cleanup in Oregon? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Oregon, DEQ approves it through a “beneficial use determination.” A short list of standing uses needs no individual approval.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Oregon’s beneficial use rules
Oregon’s beneficial use rules are OAR 340-093-0260 to 340-093-0290. Solid waste managed under a standing or case-specific beneficial use determination is not regulated as solid waste.
Standing uses under OAR 340-093-0270 need no DEQ approval when every condition is met. The standing use table covers asphalt pavement and shingles, dredged sediment, foundry sand, cleanup soil, steel slag, street sweepings, and wood-derived boiler ash. Spent abrasive is not on the list. For an unlisted material, apply for a case-specific determination under OAR 340-093-0290.
DEQ may approve a case-specific use under OAR 340-093-0280 when:
- the applicant has characterized the waste and use well enough to show compliance;
- the use has an identified or reasonably likely market and is not speculative;
- the use is a valuable part of a manufacturing process or an effective substitute for a raw material or commercial product, and is not disposal;
- the use follows engineering, commercial, and agricultural or horticultural standards;
- the material is not a hazardous waste;
- hazardous substances do not significantly exceed a comparable raw material or product, do not exceed natural background, or stay within acceptable risk levels; and
- the use does not increase a hazardous substance in a sensitive environment or create odors, dust, or other nuisance conditions.
Applying to DEQ
- Who files: any person may apply for a case-specific determination.
- How: apply through Your DEQ Online. DEQ’s beneficial use page links the user guide.
- Tier One ($1,000): for use in a manufactured product, without hazardous substances significantly above a comparable raw material. Give applicant and generator contacts, the material, how it is generated, and the yearly quantity. Compare its chemical and physical properties with the material it replaces, and show it meets OAR 340-093-0280.
- Tier Two ($2,000): for land application or elevated hazardous substances. Add sampling and analysis, a risk screening against DEQ-approved screening levels, the land use, and management measures.
- Tier Three ($5,000): for proposals that need research or a demonstration project. Add the justification, the expected time, and safe management methods.
- Review: DEQ decides the tier and fee and may ask for more information. It then issues a written determination with conditions, denies the request, or authorizes a demonstration project.
- Demonstration projects: authorized for up to one year. Submit a progress report within the year. DEQ may extend it once, for up to one more year.
- After approval: DEQ may require a material management plan, inspections, and compliance reports. It may modify or revoke a determination for misrepresentation, noncompliance, violations, or new risks. DEQ publishes a list of case-specific determinations.
Oregon DEQ: 503-229-5696, or toll free in Oregon, 800-452-4011.
Hazardous waste determination
Oregon adopts the federal hazardous waste rules by reference in OAR 340-100-0002. It covers 40 CFR Parts 260–268, 270, and 273, and Subparts A and B of Part 124, as enacted through July 30, 2020. Part 279 is adopted as enacted through July 30, 2003.
Oregon adds state hazardous wastes, including pesticide residues, under OAR 340-101-0033. Abrasive blast waste that contains pesticides has its own rule, OAR 340-101-0040(1). It applies when the waste is not a federal hazardous waste but fails DEQ’s aquatic toxicity test (96-hour LC50 at or below 250 mg/L). That waste is outside Oregon’s hazardous waste rules if it is kept out of the environment and stored no more than six months, unless the generator shows more time is needed. It must also be recycled, sent to a landfill that meets 40 CFR 258.40 design criteria, or sent to a hazardous waste or other authorized facility.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEQ, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
Tier Two applications need sampling and analysis and a risk screening against DEQ-approved, risk-based screening levels.
Finding a reuse destination
DEQ decides reuse of unlisted materials case by case. Check any destination and proposed use with DEQ before scheduling delivery.
When you talk to DEQ, describe the proposal using the criteria in OAR 340-093-0280. For example, is the material part of a manufacturing process, or a substitute for a raw material? Manufactured-product uses without elevated hazardous substances fall in Tier One. Land application falls in Tier Two. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Oregon OSHA runs Oregon’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Until the material is used, manage storage, transport, and processing to prevent releases and nuisance conditions. Blast waste with pesticides that relies on OAR 340-101-0040(1) may be stored no more than six months unless the generator shows more time is needed.
Keep job records, data sheets, lab reports, the waste determination, DEQ approvals, and the receiving site’s acceptance together. Record what ships and where it goes. DEQ may ask for a report confirming the material and practices still match the approval. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Apply through Your DEQ Online for a case-specific beneficial use determination, or confirm the DEQ approval for that material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEQ approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Is spent media a standing beneficial use?
No. The standing list covers steel slag as aggregate in asphalt, concrete, or Portland cement. Spent abrasive needs a case-specific determination.
Can the contractor or ARS file the request?
Yes. Any person may apply for a case-specific determination. Tier One applications must name the applicant and the generator.
What if the blast waste contains pesticides?
Check OAR 340-101-0040(1). Waste that fails DEQ’s aquatic toxicity test must be kept out of the environment, stored no more than six months, and recycled or sent to an authorized facility.
Can we try a use before full approval?
DEQ may authorize a demonstration project for up to one year. Submit a progress report within the year. DEQ then approves, extends once for up to a year, or denies.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any conditions in the DEQ determination.
Rules and guidance
- Oregon DEQ: Beneficial Use of Solid Waste
- OAR 340, Division 93: Solid Waste General Provisions
- OAR 340-093-0270: Standing beneficial use table
- OAR 340-093-0290: Case-specific review procedures
- OAR 340-097-0120: Solid waste fees
- OAR 340-100-0002: Adoption of federal hazardous waste rules
- OAR 340-101-0040: Wastes requiring special management
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction
- Oregon OSHA