Planning a blasting cleanup in North Carolina? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In North Carolina, material that meets the “recovered material” conditions does not need a solid waste permit. Starting January 1, 2027, DEQ can also issue a “beneficial use determination.”
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
North Carolina’s reuse rules
North Carolina’s reuse statute is G.S. 130A-309.05. Under subsection (c), recovered material does not need a solid waste permit. DEQ may require the owner to show that the material meets every condition:
- it is managed as a valuable commodity, in a way that fits its end use;
- at least 75 percent, by weight or volume, of the material stored at a facility on January 1 leaves through sale, use, or reuse by December 31;
- the material and its products are not discharged, spilled, leaked, or placed where they can enter land, air, or water;
- it is not a hazardous waste and was not recovered from a hazardous waste; and
- it has no significant foreign constituents that make it unfit for sale or its intended use.
Material accumulated speculatively, as defined in 40 CFR Part 261, does not qualify. It stays regulated as solid waste.
Subsection (d), added by S.L. 2026-41, Section 12.18, applies from January 1, 2027. It lets DEQ decide whether nonhazardous solid waste may be used at a particular site or application instead of being disposed of. DEQ may:
- authorize management of a specified type of nonhazardous solid waste at a site that is not a permitted solid waste facility; or
- issue a beneficial use determination with conditions for use in construction, land application, or other projects.
From that date, DEQ may also require a person to get a beneficial use determination instead of relying on the recovered material conditions.
Fill has its own limit. Under 15A NCAC 13B .0562, permit-free beneficial fill may use only inert debris: asphalt, cured concrete, brick, concrete block, gravel, and rock. Fill made with other solid waste needs a solid waste permit.
Applying to DEQ
- Who files: starting January 1, 2027, a person seeking a beneficial use determination applies to DEQ.
- How: submit the information on forms DEQ prescribes, plus anything else DEQ needs to decide.
- Review: DEQ also considers research and information from others on possible hazards of the waste type.
- Conditions: DEQ may require a demonstration that the waste is managed safely. It may require periodic testing and conditions that keep the material out of land, air, and water.
- Term and renewal: approvals last no longer than five years. Request renewal at least 60 days before the approval expires.
- Annual report: the applicant reports material use each year and certifies compliance with the solid waste laws and rules.
- After approval: DEQ may suspend, revoke, or modify an authorization for noncompliance or new information. DEQ posts approved determinations on its website.
- Recovered material: no application is needed. Be ready to show DEQ that the material meets the subsection (c) conditions.
DEQ Solid Waste Section: (919) 707-8200.
Hazardous waste determination
North Carolina adopts the federal hazardous waste rules (40 CFR Parts 124, 260–266, 268, 270, 273, and 279) by reference in 15A NCAC 13A .0101–.0119, including later amendments. Rule .0106 adopts Part 261, and rule .0107 adopts Part 262.
North Carolina adds a few generator requirements. Small and large quantity generators must keep at least two feet of aisle space in a central accumulation area. Generators must keep inspection records for three years. Where a state rule is more stringent than the federal rule, the state rule applies.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEQ, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
A beneficial use determination may require periodic testing of the material.
Finding a reuse destination
DEQ decides reuse case by case. Check any destination and proposed use with DEQ before scheduling delivery.
When you talk to DEQ, show how the material meets the recovered material conditions in G.S. 130A-309.05(c). From January 1, 2027, you can instead describe the site or application for a beneficial use determination. Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
North Carolina Occupational Safety and Health (NC OSH) Division runs North Carolina’s OSHA-approved State Plan. For most employers, its standards apply in place of federal OSHA and must be at least as effective.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. To keep recovered material status, plan volumes so at least 75 percent of the material stored on January 1 leaves by December 31.
Keep job records, data sheets, lab reports, the waste determination, DEQ approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Holders of a beneficial use determination file an annual usage report. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm the material meets G.S. 130A-309.05(c), or apply to DEQ for a beneficial use determination from January 1, 2027.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEQ approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can I use another project’s approval?
Usually not. A beneficial use determination covers a particular site or application and the conditions DEQ sets. Check a different material or site with DEQ first.
Who files the request?
The person seeking the beneficial use determination applies to DEQ. ARS can help gather the material information.
How long can spent media be stockpiled?
To stay recovered material, at least 75 percent of what is stored on January 1 must leave by December 31. Speculatively accumulated material stays regulated as solid waste.
Can spent media be used as fill without a permit?
No. Permit-free beneficial fill under 15A NCAC 13B .0562 may use only inert debris. Fill with other solid waste needs a solid waste permit.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any testing schedule in the DEQ approval.
Rules and guidance
- G.S. 130A-309.05: Regulated wastes; certain exclusions
- S.L. 2026-41, Section 12.18: Solid waste beneficial reuse clarification
- 15A NCAC 13B .0562: Beneficial fill
- NC DEQ: Solid Waste Rules, Laws, and Regulations
- NC DEQ: Contact the Solid Waste Staff
- 15A NCAC 13A: Hazardous Waste Management
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction
- North Carolina Occupational Safety and Health (NC OSH) Division