Planning a blasting cleanup in Montana? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Montana, DEQ issues a beneficial use determination (BUD) for an industrial or manufacturing by-product used in a specific way.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Montana’s beneficial use process
Montana DEQ sets out its process in its Guide to Beneficial Use Determinations. Under ARM 17.50.508, a person needs a license before disposing of solid waste or operating a solid waste management system. An approved BUD exempts the applicant from that license for the specific use identified.
The by-product must be nonhazardous and used in the form in which it is generated. A by-product that needs treatment or reprocessing before reuse is not eligible for a BUD. That work is resource recovery, which needs a license. DEQ judges each proposal case by case. The product and end use must:
- protect human health and the environment;
- be a use rather than disposal, consistent with the Integrated Waste Management Plan;
- substitute effectively for an analogous raw material or commercial product;
- need no decontamination or treatment;
- have a demonstrated, sustainable market;
- divert waste from disposal and save resources or energy;
- meet target contaminant levels; and
- be used in a product or activity where contaminants are chemically bound.
The guide lists coal combustion residue, including coal ash and slag from coal-fired energy production, as eligible for BUD application. Spent media also carries paint, rust, and debris from blasting. DEQ reviews other by-products case by case.
Applying to DEQ
- Who files: the person proposing the use. The form lets the applicant identify as the waste generator, a broker, an end user, or other.
- When: get DEQ approval before using the material. Until then, it remains a solid waste.
- How: complete DEQ’s BUD application form, print it, and mail it with all attachments to the Solid Waste Section in Helena. No fee is required.
- What to include: the material, its proposed use, and its benefits. Add how it will be managed and used, and the chemical and physical traits of the by-product and end product. Show a sustainable market and compliance with industry standards. Include a materials control plan and a contingency plan.
- Review time: DEQ decides in writing within 90 days of a complete application.
- Conditions: DEQ may set limits on site location, setbacks, depth to groundwater, and volume. It may also require follow-up testing, monitoring, or a risk evaluation.
- After approval: file an annual report by April 1. DEQ may revoke a BUD if its basis was wrong or no longer valid. It may also revoke for a violated condition or a public nuisance.
DEQ Solid Waste Program: (406) 444-5300.
Hazardous waste determination
Montana adopts the federal hazardous waste rules (40 CFR Parts 124, 260–268, 270, 273, and 279) by reference in ARM 17.53.105. The rule refers to the federal rules as revised on July 1, 2025.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DEQ, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
Consult DEQ before sampling for a BUD. Its analyses may include total metals, PCBs, TCLP, SPLP (EPA Method 1312), or a neutral water leach test (ASTM D3987-06).
Finding a reuse destination
DEQ decides reuse case by case. Check any destination and proposed use with DEQ before scheduling delivery.
When you talk to DEQ, describe the proposal using the example uses in its BUD guide. For example, will it replace a raw material in cement or asphalt pavement, or serve as confined fill under pavement? Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. The BUD application must describe the type of storage, the maximum inventory, and run-on and run-off controls. DEQ may set volume limits in the BUD.
Keep job records, data sheets, lab reports, the waste determination, DEQ approvals, and the receiving site’s acceptance together. Record what ships and where it goes. The annual report covers the amount used, the uses and locations, test results, and where any resulting waste went.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- File or confirm the DEQ BUD for that material, source, and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DEQ approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can I use another project’s approval?
No. A BUD covers the intended use of material from the identified source, for that applicant. DEQ considers like materials from other sources separately.
Can screened or processed spent media get a BUD?
Not if it needs treatment or reprocessing before reuse. DEQ treats that work as resource recovery, which needs a solid waste license.
Is there an application fee?
No. DEQ’s solid waste program lists no fee for a BUD application.
When do we need to test again?
Reanalyze a representative sample whenever a process change could change the material’s characteristics. Consult DEQ on the tests and sampling protocols.
Rules and guidance
- Montana DEQ: Solid Waste Program
- Montana DEQ: Guide to Beneficial Use Determinations and Application Form
- Montana DEQ: BUD Annual Reporting Form
- ARM 17.50.508: Application for Solid Waste Management System License
- ARM 17.53.105: Incorporation by Reference (hazardous waste)
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction