Planning a blasting cleanup in Mississippi? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what MDEQ needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Mississippi, MDEQ issues a beneficial use determination (BUD) for an eligible by-product and use.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Mississippi’s beneficial use rule
Mississippi’s beneficial use rule is 11 Miss. Admin. Code Pt. 4, Ch. 9. MDEQ may consider a BUD when:
- the material is a by-product: a solid waste generated in making a primary product that would otherwise go to a landfill or other disposal facility;
- it is characterized well enough to show the use protects health and the environment and that it suits the use;
- it is not putrescible and has no similar potential for nuisance;
- it replaces a raw material or other feedstock and gives a comparable benefit;
- the use does not serve solely to dispose of it; and
- the use has a demonstrated use or market.
The material must be nonhazardous as generated. Treating a waste to make it nonhazardous does not qualify it. MDEQ will not approve speculative accumulation for unproven uses or uses with no market.
Uses fall into four categories. Category I standing uses need no application, such as a by-product used as a contained or encapsulated additive in a manufactured product. Category II covers engineered construction and civil engineering uses. Category III covers soil amendments and land application. Category IV covers all other uses. Categories II to IV need MDEQ approval before the use starts.
Ask MDEQ early whether your spent media fits the by-product definition. Standing uses must still meet the eligibility rules.
Applying to MDEQ
- Who files: the generator, distributor or supplier, or end user. An applicant who is not the generator must include written consent from the generator or other owner of the material.
- How: complete MDEQ’s Request Form for a Beneficial Use Determination. Part I covers the applicant; Part II asks use-specific questions. Submit it before the use begins.
- Construction uses: for Category II, a Mississippi-licensed professional engineer must certify that the by-product suits the use. Where ASTM or other recognized standards exist, the by-product must meet them.
- Soil uses: for Category III, get certification from the Mississippi Department of Agriculture and Commerce where it applies.
- Decision: MDEQ issues a BUD or denies the request in writing. You can appeal a denial or its conditions to the Commission on Environmental Quality within 30 days.
- Limits: a BUD covers uses in Mississippi only. It does not exempt you from water and air rules. MDEQ may modify, terminate, or rescind a BUD for just cause.
- After approval: report the prior year’s activity by February 28. Include the quantity used or distributed and a current characterization. If the process has not changed, a signed certification may replace new testing.
Contact MDEQ’s Beneficial Use Program through its program page.
Hazardous waste determination
Mississippi adopts the federal hazardous waste rules (40 CFR Parts 124, 260–268, 270, 273, and 279) by reference in 11 Miss. Admin. Code Pt. 3, Ch. 1. Rule 1.3 adopts the federal generator standards in Part 262.
Mississippi adds an annual report. A generator of more than 220 pounds of hazardous waste in any month of the prior year reports to MDEQ by March 1. This replaces the federal biennial report for those generators.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, MDEQ, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
For Category II and III uses, Table A of the rule sets total-metal limits, such as 10 mg/kg lead. A metal above Table A is then tested by TCLP against the lower Table B limits, such as 0.5 mg/L lead.
Finding a reuse destination
Outside the Category I standing uses, MDEQ approves reuse case by case. Check any destination and proposed use with MDEQ before scheduling delivery.
When you talk to MDEQ, describe the proposal using the categories in Rule 9.3. For example, is the material an encapsulated additive in a product, or an engineered construction material? Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. An approved by-product stays a solid waste until it is used. Until then, the transport and storage conditions in Rule 1.5 of the Nonhazardous Solid Waste Management Regulations apply.
Keep job records, data sheets, lab reports, the waste determination, MDEQ approvals, and the receiving site’s acceptance together. Record what ships and where it goes. BUD holders report each year’s quantities and characterization to MDEQ by February 28.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- File or confirm the MDEQ BUD for that material and use.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, MDEQ approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Can the contractor or ARS file the request?
The generator, a distributor or supplier, or the end user can apply. An applicant who is not the generator needs written consent from the generator or owner. ARS can help gather the material information.
Can additives make hazardous spent media eligible?
No. The by-product must be nonhazardous as generated. Treating it to make it nonhazardous does not qualify it for a BUD.
Does a BUD expire?
Not on a set date. It stays valid while the original approval conditions hold. If the raw material or generating process changes, MDEQ must reevaluate it.
When do we need to test again?
Follow the testing schedule in the BUD. Most MDEQ BUDs require annual testing. Once a testing history exists, the holder may ask MDEQ for less frequent testing.
Rules and guidance
- MDEQ: Mississippi Beneficial Use Program
- 11 Miss. Admin. Code Pt. 4, Ch. 9: Beneficial Use of Nonhazardous Solid Waste
- MDEQ: Request Form for a Beneficial Use Determination
- 11 Miss. Admin. Code Pt. 3, Ch. 1: Hazardous Waste Management Regulations
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction