Planning a blasting cleanup in Georgia? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what Georgia’s rules require before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. Georgia’s solid waste rules use the term “recovered materials.” Material that meets the rule’s conditions is excluded from regulation as solid waste. EPD’s Recovered Materials Unit reviews applications for beneficial reuse projects.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Georgia’s recovered materials rule
Georgia’s reuse rule is Ga. Comp. R. & Regs. 391-3-4-.04(7). Recovered materials, and facilities that process them, are excluded from regulation as solid waste. To qualify, the material must:
- have a known use, reuse, or recycling potential;
- be feasibly used, reused, or recycled; and
- have been diverted or removed from the solid waste stream for sale, use, reuse, or recycling.
The rule counts a material as used, reused, or recycled when it is:
- an ingredient, including an intermediate, in a process to make a product;
- employed for its original purpose or a different one, without physically changing its composition; or
- an effective substitute for a commercial product, when the substitution does not threaten human health or the environment and the facility is not a solid waste thermal treatment facility.
Placing material on or in the land is not reuse when it amounts to disposal that, in the Director’s opinion, may threaten human health and the environment. The rule’s examples include using inherently waste-like materials as fill.
Stockpiles have a limit. During any rolling 12-month period, at least 75% of the stored material, by weight or volume, must be recycled, sold, used, or reused. Material accumulated speculatively is solid waste.
Material that does not qualify is solid waste. Under Rule 391-3-4-.02, handling it requires a solid waste handling permit unless an exemption applies.
Working with EPD
- Who reviews: the Recovered Materials Unit in EPD’s Land Protection Branch reviews applications for beneficial reuse projects.
- Proof of reuse: show sale, use, or reuse with bills of sale or other records of the material’s movement to a recycler or user. You must also show a known market or disposition for the material.
- Processing: anyone claiming to run a recovered materials processing facility must show it has the necessary equipment.
- Solid waste permits: if the material is handled as solid waste, disposal and processing permit applications go through GEOS, EPD’s online system.
- Liquids and sludge: Georgia landfills may not take bulk liquid waste, with limited exceptions. Waste that fails the Paint Filter Liquids Test (EPA Method 9095) counts as liquid.
- Other rules: meeting the solid waste rules does not relieve you of other local, state, or federal requirements.
EPD Recovered Materials Unit technical duty officer: (404) 362-2537. Solid waste technical assistance duty officer: (404) 362-2692.
Hazardous waste determination
Georgia adopts the federal hazardous waste rules (40 CFR Parts 124, 260–266, 268, 270, 273, and 279) by reference in Ga. Comp. R. & Regs. 391-3-11-.01.
Georgia adds state requirements. Under Rule 391-3-11-.08, generators must document weekly inspections of central accumulation areas and keep those records on site for three years. Small and large quantity generators also pay annual hazardous waste management fees. No fee is charged on hazardous waste that is recycled or reused.
Under 40 CFR 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, EPD, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
Under Georgia’s rule, using soil as fill is disposal when its Appendix VIII hazardous constituents exceed background levels in the area filled.
Finding a reuse destination
EPD reviews beneficial reuse projects. Check any destination and proposed use with EPD before scheduling delivery.
When you talk to EPD, describe the proposal using the categories in Rule 391-3-4-.04(7)(f). For example, is the material a manufacturing ingredient, or a substitute for a commercial product? Get the receiving site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination. Georgia solid waste disposal facilities may not accept regulated quantities of hazardous waste.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Plan volumes so at least 75% of stored material is used, sold, or recycled in any rolling 12-month period. Material accumulated speculatively is solid waste under Rule 391-3-4-.04(7)(b)–(c).
Keep job records, data sheets, lab reports, the waste determination, EPD approvals, and the receiving site’s acceptance together. Keep bills of sale or shipping records that show where the material went. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm with EPD’s Recovered Materials Unit that the use meets Georgia’s recovered materials conditions.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, Georgia’s recovered materials conditions, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Does recovered material need a solid waste permit?
Not when it meets Rule 391-3-4-.04(7). Recovered materials and their processing facilities are excluded from solid waste regulation. Material that does not meet the conditions is solid waste, and handling it needs a permit unless an exemption applies.
How long can spent media be stockpiled?
Georgia uses a turnover test. During any rolling 12-month period, at least 75% of the stored material must be recycled, sold, used, or reused. Material accumulated speculatively is solid waste.
Can spent media be used as fill?
Check with EPD first. Land placement that amounts to disposal and may threaten health or the environment is not reuse. The rule’s examples include using inherently waste-like materials as fill.
What records show the material was reused?
The rule asks for bills of sale or other records that show the material moved to a recycler or a proper use. You also need proof of a known market or disposition.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any conditions in an EPD approval.
Rules and guidance
- Georgia EPD: Recovered Materials
- Georgia EPD: Land Protection Branch programs and contacts
- Ga. Comp. R. & Regs. 391-3-4-.04: General (recovered materials)
- Ga. Comp. R. & Regs. 391-3-4-.02: Solid waste handling permits
- Georgia EPD: Solid Waste and Recovered Materials Forms (GEOS)
- Ga. Comp. R. & Regs. 391-3-11-.01: Hazardous waste rules, general provisions
- Ga. Comp. R. & Regs. 391-3-11-.08: Standards for generators
- Georgia EPD: Hazardous waste management fee guidelines (PDF)
- Georgia EPD: Existing rules and corresponding laws
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction