Planning a blasting cleanup in Delaware? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what DNREC needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Delaware, recycling and reuse operations need written DNREC approval. Delaware calls this approval a beneficial use determination (BUD).
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Delaware’s recycling permit rule
Delaware’s rule is 7 DE Admin. Code 1301, the Regulations Governing Solid Waste. Under Section 2.5.2, recycling solid waste into specific market applications requires a DNREC permit before the work starts. The application must include:
- a plan of operation that describes the types and quantities of materials accepted, the processing methods and equipment, and the products made; and
- documentation that a market exists for the products.
A BUD is typically for recyclers that handle segregated materials. More complex operations that handle mixed wastes need a Resource Recovery Facility Permit under Sections 4.4 and 9.0.
The rule does not apply to hazardous waste (2.2.4). Spent media that is hazardous follows Delaware’s hazardous waste rules instead.
Section 11.0, Part 3 sets beneficial use conditions for coal combustion residuals (CCR). Its definition of CCR includes boiler slag from coal burned to generate electricity. Before any beneficial use of CCR, contact DNREC to find out whether a permit is required (11.2.2.1). Ask DNREC whether this section applies to spent coal slag abrasive.
Stockpiles have limits. A recycling permit application states the most feedstock and product the site will stockpile. At a resource recovery facility, nonputrescible recyclables may be stored up to 30 days unless DNREC approves longer in writing (9.4.2.2.4).
Applying to DNREC
- Who files: the operation that will recycle or reuse the material. The application names the facility, its owner, and its operator.
- How: complete DNREC’s Recycling Permit Application and the Recycling and Composting Permit Checklist. Submit three copies of the full package and an electronic PDF copy to the Compliance and Permitting Section.
- Content: include proof of ownership or a lease, written zoning approval, and a plan of operation with a site map, equipment, process, and maximum stockpile amounts. Add evidence that the product use will not harm human health or the environment, and buyer contracts or letters of intent.
- Closure and other permits: include a conceptual closure plan, financial assurance for closure, proof of other required permits, and a background statement under 7 Del. C. Chapter 79.
- Completeness: DNREC will not process an application that is missing any checklist item.
- After approval: permittees must follow their permit conditions. DNREC may modify, terminate, or revoke a permit for noncompliance, misstated facts, or a danger to human health or the environment. DNREC sets each permit’s term. Apply to renew at least 180 days before it expires.
- Hauling: anyone transporting solid or hazardous waste in, out, or through Delaware needs a DNREC waste transporter permit first.
- Liquids and sludge: wastes covered by Division of Water rules are not regulated as solid waste under 7 DE Admin. Code 1301 (2.2.3). Ask DNREC which program covers wet-blasting sludge and wash water.
DNREC Compliance and Permitting Section: (302) 739-9403, 89 Kings Highway, Dover, DE 19901.
Hazardous waste determination
Delaware writes the federal hazardous waste rules into its own Regulations Governing Hazardous Waste (7 DE Admin. Code 1302), Parts 122, 124, 260–266, 268, 273, and 279.
Delaware’s reporting is stricter. A generator that is a large quantity generator in any month must file a hazardous waste report by March 1 of the next year (262.41). The federal rule requires this report every other year.
Under 7 DE Admin. Code 1302, § 262.11, the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, DNREC, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
A recycling permit application must show that the product use will not harm human health or the environment. That may require analyses and other tests.
Finding a reuse destination
Each recycling or reuse operation needs written DNREC approval. Check any destination and proposed use with DNREC before scheduling delivery.
When you talk to DNREC, describe the proposal in the terms of Section 2.5.2. What market application will use the material, and what product will it make? Confirm that the receiving site’s DNREC permit covers spent media. Get the site’s specifications and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Delaware bars sandblasting unless containment keeps the abrasive from traveling beyond the property line (7 DE Admin. Code 1106). Dry abrasive blasting of lead-containing coatings on outdoor water tanks needs a DNREC air permit. Its public notice must state how the blasting waste will be handled.
Keep job records, data sheets, lab reports, the waste determination, DNREC approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm the destination holds a DNREC recycling permit or BUD that covers this material and use.
- Get written acceptance and arrange pickup with a DNREC-permitted waste transporter.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, DNREC approval, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Who applies for the permit?
The operation that will recycle or reuse the material. The application names the facility, its owner, and its operator. ARS can help gather the material information.
Can our material go to a site that already has a permit?
Check the permit first. A recycling permit rests on the site’s plan of operation, which lists the materials, quantities, and processes. Permittees must follow their permit conditions.
Does the hauler need a permit?
Yes. Anyone transporting solid or hazardous waste in, out, or through Delaware must first get a DNREC waste transporter permit. Subcontractors need their own permit.
How long can spent media be stockpiled?
A recycling permit application sets the most feedstock and product the site will stockpile. At a resource recovery facility, nonputrescible recyclables may be stored up to 30 days unless DNREC approves longer in writing.
When do we need to test again?
Repeat the determination when the waste may have changed. Ask about retesting when the abrasive, coating, substrate, or process changes, and follow any conditions in the DNREC permit.
Rules and guidance
- DNREC: Solid Waste Facilities
- Delaware Business First Steps: Recyclers, Reuse, and Composting Operations
- DNREC: Recycling Permit Application
- DNREC: Recycling and Composting Permit Checklist
- 7 DE Admin. Code 1301: Regulations Governing Solid Waste
- 7 DE Admin. Code 1302, Part 262: Standards Applicable to Generators of Hazardous Waste
- DNREC: Hazardous Waste
- DNREC: Solid and Hazardous Waste Transporter Permits
- DNREC: Sandblasting Water Tanks
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction