Planning a blasting cleanup in Alabama? This guide covers the rules that apply to spent coal slag, the tests that decide how it can be managed, and what ADEM needs before the material can be reused.
Key terms
Coal slag abrasive
Coal slag is a glassy byproduct of coal-fired boilers. It is crushed and graded for use as blasting media.
Spent media
Spent media is the abrasive after blasting. It is mixed with paint, rust, coatings, and substrate debris. Its regulatory status depends on that mix, not on the unused abrasive.
Beneficial reuse
Beneficial reuse puts a waste material to productive use instead of disposing of it. In Alabama, “beneficial use” is a defined term that covers only land application of a by-product as a soil amendment or fertilizer. Other reuse runs through ADEM’s recycling rules, and ADEM decides how a proposal fits them.
TCLP
The Toxicity Characteristic Leaching Procedure (EPA Method 1311) measures how much of certain contaminants can leach from a sample. It is one part of deciding whether a waste is hazardous.
What’s in your spent media?
After blasting, coal slag is mixed with whatever came off the surface. That collected material needs its own evaluation. The data sheet for unused slag only describes the starting abrasive.
Coatings matter most. Lead-based paint, chromate primers, and other metal-bearing coatings can make spent media hazardous even when the abrasive itself is not. Keep track of the abrasive and the surfaces blasted. Keep wet-blasting sludge and wash water separate from dry residue.
Alabama’s recycling and beneficial use rules
Alabama’s solid waste rules are in ADEM Admin. Code Division 335-13. Under 335-13-1-.03, solid waste does not include recovered materials. Recovered materials must:
- have known recycling potential and be feasible to recycle;
- be diverted or removed from the solid waste stream for recycling; and
- be consistently used, in substantial part, to make products that would otherwise be made from raw or virgin materials.
Recovered materials do not include materials destined for any use that constitutes disposal. At least 75 percent of the material accumulated at the start of each calendar year must be recycled or transferred for recycling during that year.
Facilities that handle recovered materials must register with ADEM under chapter 335-13-3. A recovered materials processing facility may not receive, store, process, or transfer recovered material until it is registered. An end-use manufacturing facility uses recovered material in place of a raw material to make a product. It must also register with ADEM.
ADEM’s beneficial use rule, chapter 335-13-16, covers land application only. The by-product must replace a raw material as a soil amendment or fertilizer. It must be characterized, suit the agronomic application rate, and not be hazardous waste.
Working with ADEM
- Who files: the receiving facility registers. A new recovered materials processing facility or end-use manufacturing facility registers at least 45 days before it receives materials.
- How: submit Form 015 through ADEM’s online system, AEPACS. Processing facilities file the registration version. End-use manufacturers file the notification version.
- Term: processing facility registrations are valid for five years. Submit renewals at least 60 days before expiration. ADEM charges no application or renewal fee.
- Changes: a processing facility that accepts a new type of material must submit a registration modification within 30 days of first receipt. Registrations are not transferable.
- Land application: beneficial use registrations under 335-13-16 use ADEM Form 569 and run on a three-year cycle.
- Disposal: special waste needs ADEM approval before it goes to a permitted landfill. Submit ADEM Form 300. The generator gives the landfill a copy of ADEM’s approval letter.
ADEM Materials Management Section: 334-274-4201. Call before you file if your operation does not clearly match a facility type.
Hazardous waste determination
Alabama runs its own hazardous waste rules in ADEM Admin. Code Division 335-14. Chapter 335-14-2 identifies and lists hazardous waste.
Alabama adds an approval step for disposal inside the state. Hazardous waste and special waste sent to permitted disposal facilities in Alabama need ADEM approval first, under 335-14-2-.01 and 335-13-4-.26. Generators use ADEM Form 278, or the disposal facility’s form, for hazardous waste. They use Form 300 for special waste.
Under ADEM Admin. Code r. 335-14-3-.01(2), the generator must decide whether spent media is hazardous:
- Make the determination at the point of generation, before mixing or dilution. Repeat it if the waste may have changed.
- Check whether the waste is excluded from the hazardous waste rules.
- Check whether it matches a listed hazardous waste.
- Check for hazardous characteristics, including toxicity. Use knowledge of the materials and process, testing, or both. Test when knowledge alone is not enough.
Small and large quantity generators must keep records supporting the determination for at least three years after the waste was last sent for treatment, storage, or disposal.
TCLP testing and limits
Tell the lab what you blasted and what might be in the debris. Use representative samples. Agree on the sampling plan with the lab, ADEM, and the receiving site before collecting.
A waste is hazardous for toxicity if its TCLP extract meets or exceeds any limit in 40 CFR 261.24. The metals most relevant to coating debris are:
| Contaminant | EPA waste code | Limit (mg/L) |
|---|---|---|
| Arsenic | D004 | 5.0 |
| Barium | D005 | 100.0 |
| Cadmium | D006 | 1.0 |
| Chromium | D007 | 5.0 |
| Lead | D008 | 5.0 |
| Mercury | D009 | 0.2 |
| Selenium | D010 | 1.0 |
| Silver | D011 | 5.0 |
Passing TCLP addresses toxicity for the substances tested. It does not approve reuse or rule out other reasons a waste may be hazardous.
ADEM may require a special waste generator to provide an analysis and certification that the waste is nonhazardous (335-13-4-.26(1)(b)).
Finding a reuse destination
ADEM decides how each material and use fits its rules. Check any destination and proposed use with ADEM before scheduling delivery.
When you talk to ADEM, describe the proposal in the terms of its rules. For example, will a registered end-use manufacturer use the material in place of a raw material? Will a registered processing facility receive it as a recovered material? Get the receiving site’s registration, specifications, and written acceptance. If reuse is not cleared, arrange disposal that fits the waste determination.
Worker protection
- Lead: removing lead-based coatings falls under OSHA’s lead in construction standard, 29 CFR 1926.62.
- Beryllium: coal slag contains trace beryllium. OSHA has identified abrasive blasting as an operation where trace amounts can still cause significant exposure. See 29 CFR 1926.1124 and OSHA’s beryllium standards page.
- Dust: control dust during collection, storage, and loading.
Storage and records
Keep the material contained, control dust and runoff, and label loads by job. Keep other wastes out. Registered processing facilities may not accumulate recovered material speculatively. They must manage it as an item of value, with protection from the elements, runoff, and wind dispersion.
Keep job records, data sheets, lab reports, the waste determination, ADEM approvals, and the receiving site’s acceptance together. Record what ships and where it goes. Keep determination records for at least three years.
Before pickup
- Identify the abrasive, surfaces blasted, coatings, volume, moisture, and pickup location.
- Make the hazardous waste determination and complete the required tests.
- Choose a destination and get its material specifications.
- Confirm the receiving facility’s ADEM registration, or get ADEM special waste approval for disposal.
- Get written acceptance and arrange pickup.
Talk to ARS about your material, location, volume, and test results. We can help you work through pickup and the next steps.
Common questions
Is a passing TCLP test enough?
No. It answers a toxicity question for the substances tested. The full waste determination, ADEM’s rules, and the receiving site’s specifications still apply.
Can I use the original abrasive’s data sheet?
Keep it as background, but test or otherwise characterize the collected material. Blasting adds coatings and debris that the original data sheet does not cover.
Does ADEM’s beneficial use rule cover spent media?
Chapter 335-13-16 covers only land application of a by-product as a soil amendment or fertilizer. Other reuse runs through the recycling rules in chapter 335-13-3.
Does the receiving facility need to register?
Yes. A recovered materials processing facility must register before it receives material. A new end-use manufacturing facility registers at least 45 days before it receives material.
How long can spent media be stockpiled?
Speculative accumulation of recovered material is not allowed. At least 75 percent of the material on hand at the start of each calendar year must be recycled or transferred during that year.
What if the spent media goes to a landfill?
Special waste needs ADEM approval before disposal in a permitted landfill. Submit Form 300 with the hazardous waste determination. Some approvals for a waste stream may be valid for two years.
Rules and guidance
- ADEM: Recycling Program
- ADEM Admin. Code Division 335-13: Solid Waste Program
- ADEM: Waste Pre-Approval and Determinations
- ADEM Admin. Code 335-14-2: Identification and Listing of Hazardous Waste
- ADEM: Hazardous Waste Determination fact sheet
- 40 CFR 262.11: Hazardous waste determination
- 40 CFR 261.24: Toxicity characteristic
- EPA Method 1311: TCLP
- EPA: Defining Hazardous Waste
- OSHA 29 CFR 1926.62: Lead in construction
- OSHA 29 CFR 1926.1124: Beryllium in construction